over budget

₳GOV: Timelines and Treasury Data

$35,000.00 Requested
Ideascale logo View on ideascale
Community Review Results (1 reviewers)
Addresses Challenge
Feasibility
Auditability
ソリューション

Project Catalyst のデータを拡張し、支払い、資金、投票統計などを含めることで、国庫からの取引を簡単に特定できるようにする。

Problem:

カルダノのトレジャリーやファンドに関するデータは、複数のソース間で複数のフォーマットで配布されています。


チーム

[IMPACT]

Adagov is currently assembling information about Project Catalyst timelines, proposals, campaigns and funds, into a single, open and exportable database. We propose extending this to all available catalyst data which is currently distributed among a number of resources online.

You can find the currently assembled data here:

Timelines: <https://airtable.com/shrpnN4ma5uDR82X8>

Campaigns and Funds: <https://airtable.com/shrAnqV1lwc6B19tA>

The Auditability challenge aims to ensure transparency in the use of Cardano's treasury resources, which will allow the Cardano community to have more information on the development of funded proposals through a checks and balances system.

We propose aggregating and indexing all official publicly available Catalyst data to include treasury funds, funded projects, all proposals, number of wallets voting and information extracted from official funded projects documents and from the multitude of sources.

There is a large amount of data cleaning and entry to be able to execute this project successfully, but the data is available in a number of different, distributed sources.

The biggest risk is that these sources may disappear, or become closed (either technically or legally) in the time it takes to implement the project and that ongoing, these circumstances may also happen to the data sources. At this point, additional funding may be required to keep the concept operational.

[FEASIBILITY]

  • Month 1 - Acquire and assemble, extract and clean existing data into tables.
    • Week 1 - Treasury and Wallet Data
    • Week 2-4 - Proposal and Funded Proposal Data
  • Month 2-3 - Where possible, create pipelines so this extraction can occur semi-automatically or automatically.
    • Week 1 - Public Sheet Exports
    • Week 2-5 - Extraction mechanisms from web resources
    • Week 6-8 - Verification and Testing
  • Month 4+ - Continue to aggregate and standardise Catalyst data. Our goal: A 15+ contributors to the data, backups and version control and a number of integrations.

We're requesting $35,000

The following is our budget breakdown:

  • Data extraction and cleaning
    • 200 hours for data entry operator at $25/hr for $5,000
  • Project management, reporting and documentation
    • 125 hours for PM at $40/hr for $5000
  • Pipeline development (coding, automated services)
    • 140 hours for data engineer at $70/hr for $10,000
  • Integration support into other systems. (API, service fees, licences 1 yr etc.)
    • 140 hours for data engineer at $70/hr for $10,000
    • Provision for licences for dashboards and software: $5000

1 x PM, 1 x Data Engineer - Ro Mathew (ex Product Management, 10 Yrs Dev, Machine Learning Lead)

1 x Freelancer - Data Entry operator from the community or ODesk/Upwork

[AUDITABILITY]

We'll place track visits to the platform hosting data location. We will not collect any personally identifiable information and will only use this data for the purposes of Catalyst metric reporting.

A fully functioning platform that provides a unified, integrity validated source for Project Catalyst data.

Continuation of Fund 5 - Open Data and Ideas for Cooperation. This project investigated existing platforms and developed an MVP of possible operation of a platform tracking Catalyst data.

コミュニティ・アドバイザー・レビュー (1)

Comments

close

Playlist

  • EP2: epoch_length

    Authored by: Darlington Kofa

    3分 24秒
    Darlington Kofa
  • EP1: 'd' parameter

    Authored by: Darlington Kofa

    4分 3秒
    Darlington Kofa
  • EP3: key_deposit

    Authored by: Darlington Kofa

    3分 48秒
    Darlington Kofa
  • EP4: epoch_no

    Authored by: Darlington Kofa

    2分 16秒
    Darlington Kofa
  • EP5: max_block_size

    Authored by: Darlington Kofa

    3分 14秒
    Darlington Kofa
  • EP6: pool_deposit

    Authored by: Darlington Kofa

    3分 19秒
    Darlington Kofa
  • EP7: max_tx_size

    Authored by: Darlington Kofa

    4分 59秒
    Darlington Kofa
0:00
/
~0:00