Login to follow Stephen Whitenstall

Stephen Whitenstall gravatar Stephen Whitenstall QA-DAO Claim Account
Follow

Bio

Stephen has 30 years experience in organizing academic, community and business projects.

Stephen Whitenstall own proposals

Community Reviews across funding rounds

664
Total des critiques
Addresses Challenge
4.64 Star
Feasibility
4.41 Star
Auditability
4.55 Star
Value for money
4.02 Star
Impact / Alignment
4.53 Star
Impact Alignment
4.1 Star

Proposals Across Funding Rounds

14
Completed
16
Approved
22
Proposed
₳194.4K
$194K
Requested
₳0
$167.1K
Awarded
₳0
$163.5K
Received

Funding data last updated

Stephen Whitenstall Proposals (49)

Oversight of Catalyst Circle

$7,440 Received
$7,440 Requested

<p>Catalyst Circle requires independent oversight.</p><p><br></p><p>A community maintained oversight of Catalyst Circle requires support to be sustainable.</p>

Fund: Fund 6 Challenge: F6: Distributed decision making
completed Awarded 9.92% of the fund.
4.64 (33)

Open Source Training

$8,720 Received
$8,720 Requested

<p>No open-source training materials in the Entrepreneurship-Toolbox.</p><p><br></p><p>No access to open-source infrastructure for early stage entrepreneurs.</p>

Fund: Fund 6 Challenge: F6: DLT Entrepreneurship Toolbox
completed Awarded 5.813% of the fund.
4.33 (15)

Homeless Hub

$18,980 Received
$18,980 Requested

Solution: Introduce the Cardano Community to homeless communities in Manchester, UK, through in-person workshops and online sessions.

Fund: Fund 6 Challenge: F6: Scale-UP Cardano's Community Hubs
completed Awarded 18.98% of the fund.
5 (6)

Challenge: Equip the Economically Excluded

$200,000 Budget

<p>How can Cardano provide the resources to enable economically excluded people to run their own projects ?</p>

Proposed in Fund: Fund 6
Budget 3.704% of the fund.
3.83 (6)

QA-DAO Transcription Service

$39,053 Received
$39,053 Requested

Solution: Transcription, horodatage et résumé des vidéos Zoom des principaux événements communautaires, afin de les rendre accessibles, consultables et traduisibles.

Fund: Fund 7 Challenge: F7: Community Events
completed Awarded 19.527% of the fund.
4.71 (21)

Proposal Workshop

$21,915 Requested

Solution: Coordination des efforts de la communauté Catalyst pour intégrer les nouveaux proposants et accélérer le retour d'information.

Fund: Fund 7 Challenge: F7: Catalyst - Rapid Funding Mechanisms
over budget Requested 8.766% of the fund.
4.56 (9)

Catalyst-Coordinator Hub

$4,350 Received
$4,350 Requested

Solution: Mettre en place une couche collaborative, un hub communautaire, pour accueillir les proposants financés sur Catalyst et leur apporter un soutien.

Fund: Fund 7 Challenge: F7: Scale-UP Cardano's Community Hubs
completed Awarded 1.243% of the fund.
4.78 (9)

Penny Lane Liverpool Philosophy Hub

$25,755 Requested

Solution: Travailler avec les réseaux de philosophie de la communauté, afin de construire un centre de discussion basé sur la philosophie et de mener des discussions sur la philosophie au sein de Catalyst.

Fund: Fund 7 Challenge: F7: Scale-UP Cardano's Community Hubs
over budget Requested 7.359% of the fund.
4.83 (12)

Community Governance Oversight

$19,100 Received
$19,100 Requested

Solution: Enquêter, faire des rapports et faciliter les rétrospectives pour améliorer nos processus de gouvernance.

Fund: Fund 7 Challenge: F7: Improve and Grow Auditability
completed Awarded 19.1% of the fund.
4.6 (15)

Distributed Autonomous Accelerator

$55,000 Requested

Solution: Menez un projet de recherche pour un accélérateur de blockchain décentralisé radical qui nourrit des équipes qui valent la peine d'être investies dans n'importe quel contexte.

Fund: Fund 7 Challenge: F7: Catalyst Accelerator & Mentors
over budget Requested 11% of the fund.
4.27 (15)

Challenge: Improve and Grow Auditability

$200,000 Budget

Comment rendre le processus d'audit des propositions financées efficace, distribué et transparent ?

Proposed in Fund: Fund 7
Approved Approved 1.563% of the fund.
4.56 (9)

Liverpool Cardano Philosophy Hub

$14,880 Received
$18,600 Requested

Solution: Work with an established UK community philosophy network, to build a philosophy-based Hub and develop philosophy discussion within Catalyst.

Fund: Fund 8 Challenge: F8: Scale-UP Cardano's Community Hubs
funded Awarded 3.72% of the fund.
4.5 (12)

ABC of Governance

$8,108 Received
$10,135 Requested

Solution: Provide governance training and research materials to the Cardano community.

Fund: Fund 8 Challenge: F8: Miscellaneous Challenge
funded Awarded 2.027% of the fund.
4.76 (21)

Community Governance Oversight

$34,300 Received
$34,300 Requested

Solution: Provide community oversight of Catalyst governance processes.

Fund: Fund 8 Challenge: Improve and Grow Auditability
completed Awarded 17.15% of the fund.
4.67 (12)

Challenge: Improve and Grow Auditability

$350,000 Budget

How to make auditability of funded proposals & oversight of governance efficient, distributed and transparent?

Proposed in Fund: Fund 8
Budget 2.734% of the fund.
4.42 (12)

Open dApp Framework

$4,890 Received
$6,520 Requested

Solution: Conduct an analysis of existing project management dApps to provide a general, open-source framework and document it as project based learning material modules.

Fund: Fund 9 Challenge: Dapps, Products & Integrations
funded Awarded 0.083% of the fund.
4.67 (12)

Skin in the Game and Agency Theory

₳40,400 Requested

Solution: Research, develop and publish an Agency Theory approach to Cardano decentralization metrics.

Fund: Fund 10 Challenge: Catalyst Open
not approved Requested 2.886% of the fund.
4.57 (21)

Open Source Strategy

₳56,800 Requested

Solution: Information, guidance and videos on Open Source Strategy will be provided, what Open Source licenses mean, how to implement them, how to use Open Source tools and build an Open Source culture.

Fund: Fund 11 Challenge: F11: Cardano Open: Ecosystem - non-technical
not approved Requested 0.541% of the fund.
0 (0)

Monthly Reports

We are involved in a few projects and all of them have different approaches when it comes to project management. We are continuesly looking at these different approaches and trying to identify possible automations. We noticed a lot of groups using dework and trying to identify a way to integrate GitHub with Dework and the processes involved to make the automations on GitHub's side effective. Dework has some issues feeding information to GitHub so we need to create a process that feeds from GitHub to Dework.

Disbursed to Date
$9,750
Status
Still in progress
Completion Target
3. In the next 6 months
Comments 0

Login or Register to leave a comment!

We are gathering information from the other projects we are involved in. Every project has a different way of doing project management and reporting. We will use the information we gather to identify new automations. GitHub is also receiving new updates which will enable new kinds of automations. We will look at these new updates as they roll out. Once we identified any possible automations we will put them on the project board.

Disbursed to Date
$9,750
Status
Still in progress
Completion Target
3. In the next 6 months
Comments 0

Login or Register to leave a comment!

We are involved and doing research in another project (Governance Services Guild) where we are trying to identify automations that can be done on the project board that also integrates with dework. We have seen opportunities for automations, but more iterations is needed to refine the weekly processes. Once patterns are identified and verified to be consistent, we can dedicate to automating those processes. Whatever we find in this research will be brought over to this project to document and use as inspiration for more possible automations. We also closed a few tasks on the project board this month, mostly admin work, making room for more automation work.

Disbursed to Date
$9,750
Status
Still in progress
Completion Target
2. In the next 3 months
Comments 0

Login or Register to leave a comment!

The dRep White Paper Working group completed a community review of its White Paper and is preparing to launch the paper in October 2022. Biweekly meetings of Fund 8 CGO resumed after an August break in September 2022 and discussed what governance oversight deliverables to focus on. The areas of interest are likely to be a register of parameter changes in Catalyst and oversight of the upcoming Catalyst Circle Election.

Disbursed to Date
$34,300
Status
Still in progress
Completion Target
2. In the next 3 months
Comments 0

Login or Register to leave a comment!

Following our first video "Project Catalyst and the Voltaire Principles" we are commissioning translations into Spanish and Portuguese. Other videos are in research and preparation.

Disbursed to Date
$8,108
Status
Still in progress
Completion Target
3. In the next 6 months
Comments 0

Login or Register to leave a comment!

The project is complete; but the team has not had time yet to complete a close out report. We aim to do this in the coming month. Ongoing documetation of Catalyst Circle continues with the F8 proposal 800305

Disbursed to Date
$7,440
Status
Complete
Completion Target
1. In the next month
Attachment(s)
Comments 0

Login or Register to leave a comment!

We are working on our final report, which will be shared with homeless organisations in the UK; and on the project website, which will be launched on 3rd Oct.

Disbursed to Date
$18,980
Status
Complete
Completion Target
1. In the next month
Comments 0

Login or Register to leave a comment!

We took a hiatus for the month of August, as many people in the community are on holiday or away.

This month, we have been meeting to discuss project wrap-up and legacy - given that it seems unlikely, that our follow-on F9 proposal, The Proposers' Hive, will be funded due to heavy competition in the big "dApps and products" challenge, we are considering what we can usefully leave behind which will be of value to proposers long-term; to this end, we analysed the things that proposers have raised via the question below on the monthly reporting form ("Is there anything you would like to communicate… ideas or recommendations for improvements?") We are also discussing what we have learnt from this proposal about proposers' needs, and about team working across communities and time zones, with a view to writing our close-out report; and we are also attending meetings and working with proposers in our various communities, updating our Miro board to collate sensed issues, and contributing insights from here to the main Catalyst docs on process improvement for F9.

Disbursed to Date
$14,215
Status
Still in progress
Completion Target
2. In the next 3 months
Comments 0

Login or Register to leave a comment!

We continued testing the new automated Agenda on our project board and so far there hasn't been any errors or bugs. We had to transfer and update our Gitbook with all the changes we made to the project to prepare for work we will do on possible Fund 9 proposals. We created an automation that automatically labels a newly created Issue on the project board with ADA Due. So essentially we will only add items on the project board if they are payable tasks. We started documentation in our Gitbook on these newly created automations.

Disbursed to Date
$9,750
Status
Still in progress
Completion Target
2. In the next 3 months
Comments 0

Login or Register to leave a comment!

Further information can be found on our CGO GitBook at https://quality-assurance-dao.gitbook.io/community-governance-oversight/ We completed our Fund 7 CGO proposal and gave a presentation at TH Our dRep White Paper working party has started accepting community reviewers

Disbursed to Date
$34,300
Status
Still in progress
Completion Target
3. In the next 6 months
Comments 0

Login or Register to leave a comment!

We are working on follow-up videos

Disbursed to Date
$8,108
Status
Still in progress
Completion Target
2. In the next 3 months
Comments 0

Login or Register to leave a comment!

We are dropping bounty system for the following reasons.

We struggled to add items to the bounty wish list. We saw that funded projects need help with treasury and project management In order to design automations we would need to research what is needed in these projects as they are all different from each other. Research can be done by helping funded projects and identifying new automations in the process. Decided to shift our focus to doing this research and create automations where needed. We found that our own resources were sufficient to develop GitHub actions and there was insufficient bounty applications

Disbursed to Date
$9,750
Status
Still in progress
Completion Target
2. In the next 3 months
Comments 0

Login or Register to leave a comment!

Disbursed to Date
$8,108
Status
Still in progress
Completion Target
3. In the next 6 months
Attachment(s)
Comments 0

Login or Register to leave a comment!

Disbursed to Date
$34,300
Status
Still in progress
Completion Target
3. In the next 6 months
Attachment(s)
Comments 0

Login or Register to leave a comment!

The final report is near completion.

Disbursed to Date
$19,100
Status
Complete
Completion Target
1. In the next month
Attachment(s)
Comments 0

Login or Register to leave a comment!

Here is the link to the project GitBook where Catalyst Circle v3 is being documented https://quality-assurance-dao.gitbook.io/catalyst-circle-oversight-v3/

Disbursed to Date
$7,440
Status
Complete
Completion Target
1. In the next month
Attachment(s)
Comments 0

Login or Register to leave a comment!

Here is a link to the Funded Proposers Hub GitBook, where we collate the work that we have been doing https://catalyst-circle.gitbook.io/funded-proposers-hub/

This month, our focus has been on supporting proposers to flag proposals. So we have written a guide to this, and managed translations into 7 languages (translations funded by Circle Rapid Funding Mechanism).

We also produced videos on how to flag, in Spanish https://youtu.be/LBuNE7KIXgY, English https://youtu.be/LzRoI7FnSXA , and Vietnamese https://youtu.be/uZp8U0Kf8NQ

Disbursed to Date
$14,215
Status
Still in progress
Completion Target
1. In the next month
Attachment(s)
Comments 0

Login or Register to leave a comment!

Here is a link to the Catalyst After Town Hall that the project ran on 29th June 2022 https://youtu.be/xVzXwG5Z_lE

Also, 6 of the participants from this project have formed a team called Homeless Posse and have submitted a Fund 9 proposal with support from Vanessa (the facilitator on this project) and from Catalyst proposers SnapBrillia. Here is a link to it https://cardano.ideascale.com/c/idea/421065

Here is the project’s GitBook, which we are populating with documentation of all the sessions https://quality-assurance-dao.gitbook.io/homeless-hub/

Disbursed to Date
$18,980
Status
Still in progress
Completion Target
1. In the next month
Attachment(s)
Comments 0

Login or Register to leave a comment!

We finished our old proposals and started planning on the work for this proposal. We will begin work early next month. Please continue to halt the release of funds for this project. We will ask for funding again when work has been done. Here is a link to our project board in GitHub - https://github.com/orgs/Catalyst-Auditing/projects/5/views/1

Disbursed to Date
$9,750
Status
Still in progress
Completion Target
2. In the next 3 months
Attachment(s)
Comments 0

Login or Register to leave a comment!

Our GitBook is here https://catalyst-circle.gitbook.io/funded-proposers-hub/ This was initially created during a previous funded proposal to support proposers; but here is some recent work we have done to create proper guidance notes (in English) for the proposal submission form. https://catalyst-circle.gitbook.io/funded-proposers-hub/help-with-proposing-in-catalyst/proposers-guidance-notes-multi-lingual

The notes were translated into 5 additional languages using fundingfrom Circle's Rapid Funding Mechanism.

Disbursed to Date
$14,215
Status
Still in progress
Completion Target
8/31/2022
Attachment(s)
Comments 0

Login or Register to leave a comment!

The project end date is revised later than in the original bid, because we meet on Mondays, and there have been 3 bank holidays (no meeting) which we forgot to account for, which pushed the project schedule back.

Participants are currently working on a final piece to engage other homeless organisations and people in poverty in Salford, inviting them via a website to discuss questions about wealth and poverty, the financial system, crypto, etc. They are using the slogan "Don't count your chickens - anyone can face homelessness", and using painted images of a chicken (see uploaded images for 2 works-in-progress) which will be placed in several local places such as food banks, credit unions, and homelessness support organisations. The images will bear a QR code linking to a website where people can add comments and opinions. These will also be shared digitally with the Catalyst community in July.

The participants are also going to deliver an ATH session on 29th June; and are also submitting a proposal in fund 9 for a project to engage further with the Cardano blockchain.

Disbursed to Date
$18,980
Status
Still in progress
Completion Target
7/30/2022
Comments 0

Login or Register to leave a comment!

Here is the link to the project GitBook where Catalyst Circle v3 is being documented https://quality-assurance-dao.gitbook.io/catalyst-circle-oversight-v3/

Disbursed to Date
$7,440
Status
Complete
Completion Target
7/15/2022
Attachment(s)
Comments 0

Login or Register to leave a comment!

We have mostly just been closing off the old proposals and getting everything ready for this new proposal. Once we have closed the old ones we will start creating the environment for this proposal. This includes setting up dework and a list of bounties that people from the community can take. We have been meeting mostly twice a week to work on this. Another thing we've been working on passively is using the project board and trying to identify ways of automating some of the actions we do every week. The idea is to find a way to use the project board a certain way and then automate a bunch of things and possibly create content that can assist in the monthly and close out report.

Disbursed to Date
$9,750
Status
Still in progress
Completion Target
9/1/2022
Attachment(s)
Comments 0

Login or Register to leave a comment!

n/a

Disbursed to Date
$4,350
Status
Still in progress
Completion Target
7/1/2022
Comments 0

Login or Register to leave a comment!

n/a

Disbursed to Date
$4,350
Status
Still in progress
Completion Target
7/1/2022
Comments 0

Login or Register to leave a comment!

n/a

Disbursed to Date
$4,350
Status
Still in progress
Completion Target
7/1/2022
Comments 0

Login or Register to leave a comment!

n/a

Disbursed to Date
$3,480
Status
Complete
Completion Target
1/1/2022
Comments 0

Login or Register to leave a comment!

n/a

Disbursed to Date
$8,720
Status
Complete
Completion Target
6/1/2022
Comments 0

Login or Register to leave a comment!

n/a

Disbursed to Date
$8,720
Status
Complete
Completion Target
6/1/2022
Comments 0

Login or Register to leave a comment!

n/a

Disbursed to Date
$8,108
Status
Still in progress
Completion Target
9/1/2022
Comments 0

Login or Register to leave a comment!

n/a

Disbursed to Date
$34,300
Status
Still in progress
Completion Target
9/1/2022
Comments 0

Login or Register to leave a comment!

n/a

Disbursed to Date
$19,100
Status
Still in progress
Completion Target
7/1/2022
Comments 0

Login or Register to leave a comment!

n/a

Disbursed to Date
$12,700
Status
Still in progress
Completion Target
7/1/2022
Comments 0

Login or Register to leave a comment!

Not yet!

Disbursed to Date
$14,215
Status
Still in progress
Completion Target
8/31/2022
Comments 0

Login or Register to leave a comment!

Project end date is revised later, because we meet on Mondays, and there have been 3 bank holidays where we have had no meeting, which we forgot to account for, which has pushed the project schedule back.

4 project participants attended Town Hall and ATH on Weds 18th May, and the group is now planning to deliver an ATH session themselves.

Disbursed to Date
$18,980
Status
Still in progress
Completion Target
7/30/2022
Comments 0

Login or Register to leave a comment!

Here is the link to the project GitBook where Catalyst Circle v3 is being documented https://quality-assurance-dao.gitbook.io/catalyst-circle-oversight-v3/

Disbursed to Date
$7,440
Status
Still in progress
Completion Target
5/31/2022
Comments 0

Login or Register to leave a comment!

This is a link to our Gitbook where we document everything - https://quality-assurance-dao.gitbook.io/training-and-automation/introduction-and-pat-tokens/introduction-to-github-actions - And here is a link to our GitHub repo project board - https://github.com/orgs/Catalyst-Auditing/projects/5/views/1 - We created a project board and discussed and added action items.

Disbursed to Date
$9,750
Status
Still in progress
Completion Target
9/1/2022
Comments 0

Login or Register to leave a comment!

Evidence & information about the progress of this project can be found here - https://quality-assurance-dao.gitbook.io/ekphrasis/

Disbursed to Date
$4,350
Status
Still in progress
Completion Target
5/26/2022
Comments 0

Login or Register to leave a comment!

Evidence & information about the progress of this project can be found here - https://catalyst-circle.gitbook.io/funded-proposers-hub/

Disbursed to Date
$4,350
Status
Still in progress
Completion Target
5/26/2022
Comments 0

Login or Register to leave a comment!

Evidence & information about the progress of this project can be found here - https://catalyst-swarm.gitbook.io/catalyst-swarm-2022/

Disbursed to Date
$4,350
Status
Still in progress
Completion Target
7/1/2022
Comments 0

Login or Register to leave a comment!

Evidence & information about the progress of this project can be found here - https://quality-assurance-dao.gitbook.io/audit-circle/project-management/overview

Disbursed to Date
$12,700
Status
Still in progress
Completion Target
6/15/2022
Comments 0

Login or Register to leave a comment!

Evidence & information about the progress of this project can be found here - https://quality-assurance-dao.gitbook.io/community-governance-oversight/project-management/overview

Disbursed to Date
$19,100
Status
Still in progress
Completion Target
6/15/2022
Comments 0

Login or Register to leave a comment!

Evidence & information about the progress of this project can be found here - https://quality-assurance-dao.gitbook.io/training-and-automation/

Disbursed to Date
$8,720
Status
Still in progress
Completion Target
6/1/2022
Comments 0

Login or Register to leave a comment!

Evidence & information about the progress of this project can be found here - https://quality-assurance-dao.gitbook.io/training-and-automation/

Disbursed to Date
$8,720
Status
Still in progress
Completion Target
6/1/2022
Comments 0

Login or Register to leave a comment!

n/a

Disbursed to Date
$3,480
Status
Complete
Completion Target
1/1/2022
Comments 0

Login or Register to leave a comment!

Attached is an audio excerpt from a Zoom conversation on 11th April 2022 between the Homeless Hub group and Littercoin, another Catalyst funded proposal, about tokenising what we value, citizen science, and open data. This project does not plan to create a token, but the group wanted to find out more about how tokens work.

Disbursed to Date
$18,980
Status
Still in progress
Completion Target
6/30/2022
Attachment(s)
Comments 0

Login or Register to leave a comment!

Here is the link to the project GitBook where Catalyst Circle v3 is being documented https://quality-assurance-dao.gitbook.io/catalyst-circle-oversight-v3/

Closing date of the project - in the last monthly report, I miscounted that it was 30th April. Actually 12th May (end of 6th meeting of Circle v3)

Disbursed to Date
$7,440
Status
Still in progress
Completion Target
5/12/2022
Comments 0

Login or Register to leave a comment!

Evidence & information about the progress of this project can be found here - https://catalyst-circle.gitbook.io/catalyst-coordinator/

Disbursed to Date
$4,350
Status
Still in progress
Completion Target
5/26/2022
Comments 0

Login or Register to leave a comment!

Evidence & information about the progress of this project can be found here - https://catalyst-swarm.gitbook.io/catalyst-swarm-2022/

Disbursed to Date
$4,350
Status
Still in progress
Completion Target
12/31/2022
Comments 0

Login or Register to leave a comment!

GitBook Project is complete (https://catalyst-swarm.gitbook.io/catalyst-swarm-genesis) but need to produce closing video

Disbursed to Date
$3,480
Status
Complete
Completion Target
1/1/2022
Comments 0

Login or Register to leave a comment!

Evidence & information about the progress of this project can be found here - https://quality-assurance-dao.gitbook.io/training-and-automation/

Disbursed to Date
$8,720
Status
Still in progress
Completion Target
5/26/2022
Comments 0

Login or Register to leave a comment!

Evidence & information about the progress of this project can be found here - https://quality-assurance-dao.gitbook.io/training-and-automation/

Disbursed to Date
$8,720
Status
Still in progress
Completion Target
5/26/2022
Comments 0

Login or Register to leave a comment!

Evidence & information about the progress of this project can be found here - https://quality-assurance-dao.gitbook.io/audit-circle/project-management/overview

Disbursed to Date
$12,700
Status
Still in progress
Completion Target
5/26/2022
Comments 0

Login or Register to leave a comment!

Evidence & information about the progress of this project can be found here - https://quality-assurance-dao.gitbook.io/community-governance-oversight/project-management/overview

Disbursed to Date
$19,100
Status
Still in progress
Completion Target
5/19/2022
Comments 0

Login or Register to leave a comment!

I am behind with documentation. By next monthly report, I will have a GitBook available with blogs, session documentation, images and video from the project.

Disbursed to Date
$18,980
Status
Still in progress
Completion Target
5/30/2022
Comments 0

Login or Register to leave a comment!

Here is the link to the project GitBook where Catalyst Circle v3 is being documented https://quality-assurance-dao.gitbook.io/catalyst-circle-oversight-v3/

NB The GitBook is the main "evidence" of the project's progress - it would be great if the "please share any evidence" field also included space for text, where links can be added.

Disbursed to Date
$7,440
Status
Still in progress
Completion Target
4/30/2022
Comments 0