Claim Your Account

Lets get you verified!

Verification Code
CODE$:

Great! You may close this page
after you've sent us the code on ideascale.

You will receive a confirmation once your account is validated

To verify your ownership of this profile,
please send a personal message to Lido Nation
on ideascale and include the code above.

Login to follow Matthias Sieber

Matthias Sieber gravatar Matthias Sieber Loxe Claim Account
Follow

Bio

Missing Bio. Claim profile to add a bio.

Matthias Sieber own proposals

Community Reviews across funding rounds

834
総評
Addresses Challenge
4.23 Star
Feasibility
3.97 Star
Auditability
3.69 Star
Impact / Alignment
3.33 Star

Proposals Across Funding Rounds

6
Completed
12
Approved
40
Proposed
₳0
$1.2M
Requested
₳0
$219.7K
Awarded
₳0
$194.1K
Received

Funding data last updated

Matthias Sieber Proposals (71)

$87,700 Requested

Gravatar for ADA Wallets Quick Pitch

$87,700 Received
$87,700 Requested

<p>Hashed public key based wallet addresses are not human-readable and do not offer personalization.</p>

Fund: Fund 6 Challenge: F6: Developer ecosystem
completed Awarded 8.726% of the fund.
5 (6)

Blace.io: Marketplace Creator Quick Pitch

$115,700 Requested

<p>As marketplaces are being built, repeat work is being executed, cutting into the overall efficiency of developers.</p>

Fund: Fund 6 Challenge: F6: Developer ecosystem
over budget Requested 11.512% of the fund.
4.67 (15)

Win-Win Dispute Resolution

$25,000 Received
$25,000 Requested

<p>The legal dispute resolution space suffers from an antiquated reputation model, ethical dilemmas, and little use of helpful technology.</p>

Fund: Fund 6 Challenge: F6: DApps & Integrations
funded Awarded 10% of the fund.
5 (6)

Scam Alert

$9,884 Requested

<p>New people in the crypto space fall for scams all the time. Organizations, and individuals within the community receive threats of violence.</p>

Fund: Fund 6 Challenge: F6: Cardano Emerging Threat Alarm
not approved Requested 19.768% of the fund.
2.39 (18)

Haskell & Coffee ☕

$8,200 Received
$8,200 Requested

Solution: Haskellを使ってコードの問題に取り組むために、週に一度、カフェインの入ったハングアウトを、楽しく、快適な仮想環境で行います。

Fund: Fund 7 Challenge: F7: Community Events
completed Awarded 4.1% of the fund.
4.42 (24)

Fact Check for Cardano

$20,000 Received
$20,000 Requested

Solution: Cardanoのファクトチェックサイトを構築し、コミュニティがキュレーションできるようにする。

Fund: Fund 7 Challenge: F7: Disarm cyber disinformation attacks
completed Awarded 20% of the fund.
4.52 (33)

Loxe Inc. Plutus Internship Program

$9,000 Received
$9,000 Requested

Solution: 新しいPlutus開発者にメンターシップと実際の仕事の経験を提供する。

Fund: Fund 7 Challenge: F7: Miscellaneous Challenge
completed Awarded 4.5% of the fund.
4.75 (12)

Challenge: Developer Ecosystem

$1,000,000 Budget

どうすれば、開発者が成功するアプリの開発に集中できるような、ポジティブな開発者体験を作ることができるでしょうか?

Proposed in Fund: Fund 7
Approved Approved 7.813% of the fund.
4.75 (12)

Property Registration for Housing

$98,400 Requested

Solution: A permissionless system that allows property owners to participate in housing programs.

Fund: Fund 8 Challenge: F8: Nation Building Dapps
over budget Requested 12.3% of the fund.
4.29 (21)

Adatar.me for ATOM

$6,000 Received
$8,000 Requested

Solution: Add ATOM support to adatar.me.

Fund: Fund 8 Challenge: F8: Cross-Chain Collaboration
funded Awarded 2% of the fund.
4.15 (33)

Adatar.me for MANA

$8,000 Requested

Solution: Add MANA support to adatar.me.

Fund: Fund 8 Challenge: F8: Cross-Chain Collaboration
over budget Requested 2% of the fund.
4.03 (30)

Adatar.me for DOT

$8,000 Requested

Solution: adatar.meにDOTサポートを追加しました。

Fund: Fund 8 Challenge: F8: Cross-Chain Collaboration
over budget Requested 2% of the fund.
3.93 (30)

Adatar.me for IOTA

$8,000 Requested

Solution: Add IOTA support to adatar.me.

Fund: Fund 8 Challenge: F8: Cross-Chain Collaboration
over budget Requested 2% of the fund.
3.73 (45)

Fiverr Clone on Cardano

$250,000 Requested

Solution: Build a fair marketplace with fair fees to benefit both sides of the marketplace.

Fund: Fund 8 Challenge: F8: DApps and Integrations
over budget Requested 10% of the fund.
4.58 (12)

Adatar.me Address Book

$10,000 Requested

Solution: Adatar.meのアドレス帳を開発する。

Fund: Fund 8 Challenge: F8: DApps and Integrations
over budget Requested 0.4% of the fund.
4.53 (15)

Win-Win Japan Expansion

$11,250 Received
$15,000 Requested

Solution: Outreach universities, legal bodies and local governments in Japan to expand and localize Win-Win services.

Fund: Fund 8 Challenge: F8: Grow East Asia, Grow Cardano
funded Awarded 10% of the fund.
4.73 (15)

Tenant Profile

$60,000 Requested

Solution: A standard that allows for compatibility matching between tenants, and tenant(s) to housing units.

Fund: Fund 8 Challenge: Open Standards & Interoperability
over budget Requested 12% of the fund.
4.13 (15)

Win-Win Platform Auditing

$80,000 Requested

Solution: Get an expert 3rd party to audit the smart contracts of the Win-Win platform.

Fund: Fund 8 Challenge: F8: DApps and Integrations
over budget Requested 3.2% of the fund.
4.67 (12)

Monthly Reports

Nothing to add in relation to previous reports.

Disbursed to Date
$0
Status
Still in progress
Completion Target
1. In the next month
Comments 0

Login or Register to leave a comment!

We are currently doing some prep work that will help us to be more efficient in relation to our 4 adatar.me funded proposals. This work is the same and shared between proposals, so our report during this time is also going to be the same for all 4.

Disbursed to Date
$6,000
Status
Still in progress
Completion Target
2. In the next 3 months
Comments 0

Login or Register to leave a comment!

We are currently doing some prep work that will help us to be more efficient in relation to our 4 adatar.me funded proposals. This work is the same and shared between proposals, so our report during this time is also going to be the same for all 4.

Disbursed to Date
$6,000
Status
Still in progress
Completion Target
2. In the next 3 months
Comments 0

Login or Register to leave a comment!

We are currently doing some prep work that will help us to be more efficient in relation to our 4 adatar.me funded proposals. This work is the same and shared between proposals, so our report during this time is also going to be the same for all 4.

Disbursed to Date
$6,000
Status
Still in progress
Completion Target
2. In the next 3 months
Comments 0

Login or Register to leave a comment!

The recording of the sessions are being uploaded to this YouTube playlist: https://youtube.com/playlist?list=PLzRV1oB99VB40ircGnuCspkIs6zrbXLAi. Discussions between sessions were moved from here (https://discord.gg/mbHHWxxmH3) to here (https://discord.gg/Gqr6bGBw4B).

Disbursed to Date
$8,200
Status
Still in progress
Completion Target
2. In the next 3 months
Comments 0

Login or Register to leave a comment!

We’ve found a new Plutus intern and are onboarding him early next month.

Disbursed to Date
$9,000
Status
Still in progress
Completion Target
2. In the next 3 months
Attachment(s)
Comments 0

Login or Register to leave a comment!

Nothing to add in relation to previous reports.

Disbursed to Date
$15,000
Status
Still in progress
Completion Target
1. In the next month
Comments 0

Login or Register to leave a comment!

Nothing to add in relation to previous reports.

Disbursed to Date
$20,000
Status
Still in progress
Completion Target
3. In the next 6 months
Comments 0

Login or Register to leave a comment!

Nothing to add right now.

Disbursed to Date
$25,000
Status
Launched
Completion Target
1. In the next month
Comments 0

Login or Register to leave a comment!

Our CTO has written an article talking about the difficulties that we have been facing with the launch of our platform: https://www.linkedin.com/pulse/production-readiness-pab-chain-index-eli-selkin/?trackingId=BpvbkNFER1CTNQZB40k7Bg%3D%3D. Besides this, we have been hosting sessions with mediators that are going to use our platform, we we have onboarded ~15 so far.

Disbursed to Date
$25,000
Status
Still in progress
Completion Target
1. In the next month
Attachment(s)
Comments 0

Login or Register to leave a comment!

As mentioned in the previous report, we currently have one Plutus intern working with us, but the other candidate that was potentially going to work with us ended up not being a good fit. We have slightly changed our plan regarding the execution of this proposal, and more information will be shared in the close-out report that we are going to submit before the next reporting cycle.

Disbursed to Date
$9,000
Status
Still in progress
Completion Target
1. In the next month
Attachment(s)
Comments 0

Login or Register to leave a comment!

We had been in touch with IOG regarding the delay on the execution of this proposal, and we mentioned the new timeline and expected completion date.

Disbursed to Date
$0
Status
Still in progress
Completion Target
2. In the next 3 months
Attachment(s)
Comments 0

Login or Register to leave a comment!

We are currently doing some prep work that will help us to be more efficient in relation to our 4 adatar.me funded proposals. This work is the same and shared between proposals, so our report during this time is also going to be the same for all 4.

Disbursed to Date
$6,000
Status
Still in progress
Completion Target
2. In the next 3 months
Attachment(s)
Comments 0

Login or Register to leave a comment!

We are currently doing some prep work that will help us to be more efficient in relation to our 4 adatar.me funded proposals. This work is the same and shared between proposals, so our report during this time is also going to be the same for all 4.

Disbursed to Date
$6,000
Status
Still in progress
Completion Target
2. In the next 3 months
Attachment(s)
Comments 0

Login or Register to leave a comment!

The recording of the sessions are being uploaded to this YouTube playlist: https://youtube.com/playlist?list=PLzRV1oB99VB40ircGnuCspkIs6zrbXLAi. Discussions between sessions are taking place here: https://discord.gg/mbHHWxxmH3.

Disbursed to Date
$8,200
Status
Still in progress
Completion Target
2. In the next 3 months
Attachment(s)
Comments 0

Login or Register to leave a comment!

As stated in the previous reports, we've reached out to some ADR professionals and also a few institutions, and currently we are working to finalize our report regarding the ADR market in Brazil. We have finished the localization of mediators.ai website to Portuguese, onboarded 5 mediators and 1 institution.

Disbursed to Date
$15,000
Status
Still in progress
Completion Target
1. In the next month
Attachment(s)
Comments 0

Login or Register to leave a comment!

Since last month, we are considering using an alternative technology to create the DIDs, so we can work on delivering the solution with this alternative techonology before PRISM is in production. We had a few discussion with ProofSpace team and used their technology in a different project. We are also talking to IOG to get more information about the readiness level of PRISM.

Disbursed to Date
$20,000
Status
Still in progress
Completion Target
3. In the next 6 months
Attachment(s)
Comments 0

Login or Register to leave a comment!

We are currently doing some prep work that will help us to be more efficient in relation to our 4 adatar.me funded proposals. This work is the same and shared between proposals, so our report during this time is also going to be the same for all 4.

Disbursed to Date
$6,000
Status
Still in progress
Completion Target
2. In the next 3 months
Attachment(s)
Comments 0

Login or Register to leave a comment!

We are currently doing some prep work that will help us to be more efficient in relation to our 4 adatar.me funded proposals. This work is the same and shared between proposals, so our report during this time is also going to be the same for all 4.

Disbursed to Date
$6,000
Status
Still in progress
Completion Target
9/30/2022
Attachment(s)
Comments 0

Login or Register to leave a comment!

The recording of the sessions are being uploaded to this YouTube playlist: https://youtube.com/playlist?list=PLzRV1oB99VB40ircGnuCspkIs6zrbXLAi. Discussions between sessions are taking place here: https://discord.gg/mbHHWxxmH3

Disbursed to Date
$8,200
Status
Launched
Completion Target
9/2/2022
Attachment(s)
Comments 0

Login or Register to leave a comment!

As mentioned in the previous report, we currently have one Plutus intern working with us, but the other candidate that was potentially going to work with us ended up not being a good fit. We are still looking for the second intern.

Disbursed to Date
$9,000
Status
Still in progress
Completion Target
8/31/2022
Attachment(s)
Comments 0

Login or Register to leave a comment!

We are currently doing some prep work that will help us to be more efficient in relation to our 4 adatar.me funded proposals. This work is the same and shared between proposals, so our report during this time is also going to be the same for all 4.

Disbursed to Date
$6,000
Status
Still in progress
Completion Target
9/30/2022
Attachment(s)
Comments 0

Login or Register to leave a comment!

We are currently doing some prep work that will help us to be more efficient in relation to our 4 adatar.me funded proposals. This work is the same and shared between proposals, so our report during this time is also going to be the same for all 4.

Disbursed to Date
$6,000
Status
Still in progress
Completion Target
9/30/2022
Attachment(s)
Comments 0

Login or Register to leave a comment!

We are considering using an alternative technology to create the DIDs, so we can work on delivering the solution with this alternative techonology before PRISM is in production. We are going to talk to IOG and the community about this possibility.

Disbursed to Date
$20,000
Status
Still in progress
Completion Target
12/31/2022
Attachment(s)
Comments 0

Login or Register to leave a comment!

We had been in touch with IOG regarding the delay on the execution of this proposal, and we mentioned the new timeline and expected completion date.

Disbursed to Date
$0
Status
Still in progress
Completion Target
8/31/2022
Attachment(s)
Comments 0

Login or Register to leave a comment!

As stated in the previous reports, we've reached out to some ADR professionals and also a few institutions, and currently we are working to finalize our report regarding the ADR market in Brazil. We are also already working to localize the mediators.ai website to Portuguese, onboard 5 mediators and 1 institution.

Disbursed to Date
$15,000
Status
Still in progress
Completion Target
6/30/2022
Attachment(s)
Comments 0

Login or Register to leave a comment!

We’ve been testing on testnet for more than a month now, receiving feedback from some mediators but specially internal testing. As mentioned, the last thing pending for launch is mainnet DB sync.

Disbursed to Date
$25,000
Status
Still in progress
Completion Target
7/31/2022
Attachment(s)
Comments 0

Login or Register to leave a comment!

We have just been funded and will start working on this proposal by the beginning of June.

Disbursed to Date
$6,000
Status
Still in progress
Completion Target
7/31/2022
Comments 0

Login or Register to leave a comment!

We have just been funded and will start working on this proposal by the beginning of June.

Disbursed to Date
$6,000
Status
Still in progress
Completion Target
7/31/2022
Comments 0

Login or Register to leave a comment!

As stated in the previous report, we've reached out to some ADR professionals and also a few institutions, and currently we are about to finalize our report regarding the ADR market in Brazil. After that, we are going to localize the mediators.ai website to Portuguese, onboard 5 mediators and 1 institution.

Disbursed to Date
$15,000
Status
Still in progress
Completion Target
6/30/2022
Comments 0

Login or Register to leave a comment!

We are waiting for the SDK release, and in the mean time we've been expanding our team at Loxe to be able to quickly execute this proposal once we have access to the SDK.

Disbursed to Date
$0
Status
Still in progress
Completion Target
6/30/2022
Comments 0

Login or Register to leave a comment!

Evrything was already developed and tested. We are now finalizing the description of the repository in GitHub and preparing the close-out report and video, so we are closing this out within one week.

Disbursed to Date
$10,000
Status
Still in progress
Completion Target
5/31/2022
Comments 0

Login or Register to leave a comment!

We currently have one Plutus intern working with us, and there's another very good candidate that might start soon.

Disbursed to Date
$9,000
Status
Still in progress
Completion Target
7/31/2022
Comments 0

Login or Register to leave a comment!

As mentioned, we had a delay due to availability of resources, but we are marketing the course and will start it soon, by the beginning of June.

Disbursed to Date
$8,200
Status
Still in progress
Completion Target
8/31/2022
Comments 0

Login or Register to leave a comment!

We have just been funded and will start working on this proposal by the beginning of June.

Disbursed to Date
$6,000
Status
Still in progress
Completion Target
7/31/2022
Comments 0

Login or Register to leave a comment!

Completion date shared above is only a rough estimate since we are not sure when PRISM will be live in production

Disbursed to Date
$20,000
Status
Still in progress
Completion Target
12/31/2022
Comments 0

Login or Register to leave a comment!

We launched on testnet this month. We are currently under testing with some employees, mediators, advisors and general public, and we will soon launched on testnet.

Disbursed to Date
$25,000
Status
Still in progress
Completion Target
6/30/2022
Comments 0

Login or Register to leave a comment!

We are still actively looking for interns.

Disbursed to Date
$9,000
Status
Still in progress
Completion Target
7/31/2022
Comments 0

Login or Register to leave a comment!

The proposal is progressing as expected.

Disbursed to Date
$10,000
Status
Still in progress
Completion Target
5/31/2022
Comments 0

Login or Register to leave a comment!

We've reached out to more ADR professionals and also a few institutions, and are currently working on the report.

Disbursed to Date
$15,000
Status
Still in progress
Completion Target
6/30/2022
Comments 0

Login or Register to leave a comment!

Completion date shared above is only a rough estimate since we are not sure when PRISM will be live in production.

Disbursed to Date
$20,000
Status
Still in progress
Completion Target
12/31/2022
Comments 0

Login or Register to leave a comment!

We might launch prior to the expected date above, we we've started the public sale of out ADR token (https://tokens.loxeinc.com/).

Disbursed to Date
$25,000
Status
Still in progress
Completion Target
5/31/2022
Comments 0

Login or Register to leave a comment!

Not right now.

Disbursed to Date
$0
Status
Still in progress
Completion Target
6/30/2022
Comments 0

Login or Register to leave a comment!

We are about to start the classes.

Disbursed to Date
$8,200
Status
Still in progress
Completion Target
6/30/2022
Comments 0

Login or Register to leave a comment!

We are preparing the content of the classes and plan to start them by mid next month.

Disbursed to Date
$8,200
Status
Still in progress
Completion Target
6/30/2022
Comments 0

Login or Register to leave a comment!

We are currently actively looking for interns and starting to market our internship program.

Disbursed to Date
$9,000
Status
Still in progress
Completion Target
7/31/2022
Comments 0

Login or Register to leave a comment!

We are raising funds outside Catalyst to accelerate the development, and we expect to launch on testnet on April. We have new advisors and are talking with some more to bring them onboard. The completion date provided above is an estimate.

Disbursed to Date
$25,000
Status
Still in progress
Completion Target
5/31/2022
Comments 0

Login or Register to leave a comment!

Completion date shared above is only a rough estimate since we are not sure when PRISM will be live in production.

Disbursed to Date
$20,000
Status
Still in progress
Completion Target
12/31/2022
Comments 0

Login or Register to leave a comment!

We’ve already reached out to some ADR professionals in Brazil and we are starting to study the Brazilian market and to prepare a report.

Disbursed to Date
$15,000
Status
Still in progress
Completion Target
6/30/2022
Comments 0

Login or Register to leave a comment!

We have already developed a flow chart for the smart contract and started building it. We are currently evaluation the integration with an oracle and testing it out.

Disbursed to Date
$10,000
Status
Still in progress
Completion Target
5/31/2022
Comments 0

Login or Register to leave a comment!

We had the onboarding call with Coti team this month. Besides this, nothing to add right now.

Disbursed to Date
$0
Status
Still in progress
Completion Target
6/30/2022
Comments 0

Login or Register to leave a comment!

We managed to launch ahead of the schedule, at the beginning of February. More details on the close-out report.

Disbursed to Date
$87,700
Status
Complete
Completion Target
2/28/2022