completed

Strengthening Stake Pools in Africa

$22,000.00 Received
$22,000.00 Requested
Ideascale logo View on ideascale
Community Review Results (1 reviewers)
Addresses Challenge
Feasibility
Auditability
Problem:

<p>Stakepools in Africa are subject to outages and infrastructure issues on top of the general risks faced by SPOs</p>

Yes Votes:
₳ 128,864,182
No Votes:
₳ 28,327,050
Votes Cast:
733

This proposal was approved and funded by the Cardano Community via Project F6: Disaster: When all is at stake Catalyst funding round.

  • download
  • download
  • download

Detailed Plan

<u>Main Deliverables</u>

Peer-to-peer collaboration portal within the WADA membership platform solely for the benefit of African SPOs and disaster-recovery support.

Main output would be a document containing:

  • Guidelines for emergency preparations and disaster recovery
  • Risk analysis and screening of both general and specific regional challenges
  • Benchmarks to measure the stability, resilience and decentralized nature of African stakepools
  • Rewards scheme for participating in network stress-testing and contributing to documentation

———IMPACT––––

<u>How does the proposal fit into this challenge?</u>

By creating an environment where African SPOs can connect, learn from each other and share best practices, we can incentivize further SPO participation in disaster recovery and stress-testing, as well as identify the unique challenges faced by them.

<u>How will this campaign add value to our ecosystem?</u>

A more robust stakepool network, that can respond faster to unexpected downtimes adds to the security, reliability and value of the wider ecosystem overall.

—––FEASIBILITY———

<u>Roadmap:</u>

After successful funding:

  • Identify at least 5 African SPOs to take part in this program and onboard them onto the WADA membership platform
  • 30 days - Create the documentation outline, checklists and rewards scheme for the SPOs
  • 90 days - Observe the SPOs and track uptimes and other health metrics, conduct the risk analysis and finalize documentation
  • Deliver the documentation for public access and feedback from other SPO networks and community members
  • Expected public launch date: Dec 15th

Post-program:

  • Program survey and report creation based on each SPOs stakepool health throughout the 3 months
  • Extend project to include dashboards, webapps and real-time data built into the SPO collaboration portal, hosted by WADA

<u>Core Team & Roles:</u>

Josh F - Project Lead, Finance Lead @ WADA

Genty - DRC Stakepools, Business Initiatives Lead @ WADA

Mercy - Partnerships, Coordination lead @ WADA

+WADA Team

Main Stakeholder: WADA (https://wadalliance.org)

Other Stakeholders:

  • Stakepool XYZ
  • African SPO Alliance
  • WADA Stakepool
  • Up-To-Date Developers (DRC)

<u>Budget:</u>

Team fees $8000

SPO incentives $7000

Platform development costs $4000

Technical consultations $3000

———AUDITABILITY–––––

<u>What success looks like:</u>

3 months: SPOs all completed their reporting and contributed significantly to the documentation, which is well received by the community.

6 months: Feedback gathered on both the program and the current state of SPOs in Africa, what their risk profiles are and how to address their main challenges.

12 months: Second iteration of project launched, with a focus on software tools, dashboards and data management to support a larger number of SPOs.

<u>Challenge Metrics Addressed:</u>

  • Risks scores for stakepools, before and after the program

  • No. SPOs onboarded onto the collaboration platform

  • No. of SPOs contributing to the documentation

  • No. of SPO delivering weekly reports on stakepool health

  • % SPOs who complete the 3-month program

  • Approval rating of the program from SPOs

  • Fair compensation rating

  • Risk score improvements

  • Rewards and Incentives metrics, based on participation

<u>Affiliated Proposals:</u>

Infrastructure Development for Africa:

<https://cardano.ideascale.com/a/dtd/Infrastructure-Devt-=-Access-Africa/367618-48088>

SPO staked portfolio DApp + Wallet

https://cardano.ideascale.com/a/dtd/SPO-staked-portfolio-DApp-+-Wallet/369313-48088

Scale-UP Cardano's Community Hubs:

<https://cardano.ideascale.com/a/dtd/Scale-UP-Cardano-s-Community-Hubs/369413-48088>

-------------------------------------------------

Interested in contributing or partnering? Get in touch by sending a private message

---------------------------------------------------

Reseñas de CAs (1)

Comments

Monthly Reports

N/A

Disbursed to Date
$22,000
Status
Still in progress
Completion Target
7/15/2022
Comments 0

Login or Register to leave a comment!

N/A

Disbursed to Date
$22,000
Status
Still in progress
Completion Target
8/15/2022
Comments 0

Login or Register to leave a comment!

N/A

Disbursed to Date
$22,000
Status
Still in progress
Completion Target
9/15/2022
Comments 0

Login or Register to leave a comment!

N/A

Disbursed to Date
$22,000
Status
Still in progress
Completion Target
9/15/2022
Attachment(s)
Comments 0

Login or Register to leave a comment!

-

Disbursed to Date
$22,000
Status
Still in progress
Completion Target
3. In the next 6 months
Attachment(s)
Comments 0

Login or Register to leave a comment!

-

Disbursed to Date
$22,000
Status
Still in progress
Completion Target
3. In the next 6 months
Attachment(s)
Comments 0

Login or Register to leave a comment!

Events - Next ASPA monthly booked. Content - Document structure outline. Onboarding - New stakepool joined ASPA (Goma).

Disbursed to Date
$22,000
Status
Still in progress
Completion Target
2. In the next 3 months
Attachment(s)
Comments 0

Login or Register to leave a comment!

Events - Monthly ASPA meeting held and next ASPA monthly booked.
Development - Utilizing ASPA for relevant IPSOs. (Talks of boosting network presence through the marketing of token offerings)

Disbursed to Date
$22,000
Status
Still in progress
Completion Target
3. In the next 6 months
Attachment(s)
Comments 0

Login or Register to leave a comment!

Meeting between several members of ASPA - coordinated in early November, concerning the GOMA stakepool and activities therein.

Disbursed to Date
$22,000
Status
Still in progress
Completion Target
2. In the next 3 months
Attachment(s)
Comments 0

Login or Register to leave a comment!

close

Playlist

  • EP2: epoch_length

    Authored by: Darlington Kofa

    3m 24s
    Darlington Kofa
  • EP1: 'd' parameter

    Authored by: Darlington Kofa

    4m 3s
    Darlington Kofa
  • EP3: key_deposit

    Authored by: Darlington Kofa

    3m 48s
    Darlington Kofa
  • EP4: epoch_no

    Authored by: Darlington Kofa

    2m 16s
    Darlington Kofa
  • EP5: max_block_size

    Authored by: Darlington Kofa

    3m 14s
    Darlington Kofa
  • EP6: pool_deposit

    Authored by: Darlington Kofa

    3m 19s
    Darlington Kofa
  • EP7: max_tx_size

    Authored by: Darlington Kofa

    4m 59s
    Darlington Kofa
0:00
/
~0:00