What are the key milestones you need to achieve in order to complete your project successfully?
Answer:
System design analysis (4 weeks of implementation)
- Analyze and make a list of use cases about usage needs
- Design functional models, system logic models, database models, and bases for programming
- Output products :
+ Documentation of user needs analysis
+ System design documentation: system logic model, source code directory organization structure, database model
- Acceptance Criteria:
+ For the requirements analysis document, do the following:
o System functional model
o Describe the tasks and functions of each component in the system functional model
- For technical design documents, perform the following contents:
o System logic model
o Source code organizational structure model
o Database Model
o Programming standards
- Proof of Milestone Completion
Upload videos and documents made to https://docs.google.com, including:
o Requirements analysis document (.pdf file)
o Technical design document (.pdf file)
- Handover date: March 18, 2024
- Cost: 29,900 (Total Fundraising * 30%)
>Answer:
Programming to build products related to the access channel (5 weeks of implementation)
- Output products : Complete the interface, functions and processing flow of 3 modules
- Acceptance Criteria:
o Specifically, do the following:
+ Finish building the access channel framework (home page)
+ Complete the Login Wallet module
+ Complete the coin Catalog module
- Handover date: April 19, 2024
- Cost: 14,950 (Total Fundraising * 15%)
>Answer:
Programming to build products related to languages, news, announcements (5 weeks of implementation)
- Output products : complete interface, function and flow of 3 modules
- Acceptance Criteria:
o Specifically, do the following:
+ Complete the Notification module
+ Complete the News module
+ Complete log analysis module to synchronize news, coin price
- Handover date: May 19, 2024
- Cost: 14,950 (Total Fundraising * 15%)
>Answer:
Programming to build products related to coin prices, profit and loss statistics (5 weeks of implementation)
- Output products : Complete the interface, functions and processing flow of 2 modules
- Acceptance Criteria:
o Specifically, do the following:
+ Complete the Coin Price Chart module
+ Complete the Profit/Loss Statistical Chart module
- Handover date: June 17, 2024
- Cost: 14,950(Total Fundraising * 15%)
- Proof of Milestone completion:
o Upload a video to return to product manipulation by each screen built according to user request documents and upload to https://docs.google.com
o Updated build of modules at https://testnet.og-pc.me
>Answer:
Software testing (7 weeks of implementation)
- Check software functions: correct/wrong, convenient operation, etc.
- Performance test: page loading speed meets needs
- Security testing: type of testing the security level of the product caused by the source code
- Overall review to check all functions and performance of the software
- Overview of UI/UX screens
-Output products:
o Document reporting test results
o Test documents for each functional screen have been approved and met requirements
-Acceptance criteria:
o To test the software, do the following:
+ Complete Test Case documents
+ Complete test report: functional test, security test, performance test
o Usecases in the feature block must meet the following standards:
+ Complete the building access channel frame (home page)
+ Complete the Login Wallet module
+ Complete the Coin List module
+ Complete notification module
+ Complete the News module
+ Complete the log analysis module to synchronize news and coin prices
+ Complete the Coin Price Chart module
+ Complete the Profit/Loss Statistics Chart module
- Evidence of milestone completion
o Upload videos and created documents to https://docs.google.com, including:
+ Record videos of pages in Test Case documents
+ Record videos of pages in product test results documents according to Test Case
+ Test Case documents, test results report documents (function, security, performance)
+ Error recording documents, error handling during testing and product error correction
o Upload videos and documents to https://docs.google.com and test the system https://testnet.og-pc.me
-Handover date: August 18, 2024
-Cost: 14,950 (Total fundraising amount * 15%)
>Answer:
Completed and officially announced (1 week of implementation)
- Official product announcement through community and other forms of promotion
- Output products :
· Run the mainnet and announce to the Cardano community
- Acceptance Criteria:
o Documents on the official release plan:
+ Announced run time
+ Assign personnel to make announcements
+ Assign personnel to develop product promotion materials
- Proof of Milestone Completion
o All announcements and links, publication documents are updated on the system https://og-pc.me
- Handover date: August 26, 2024
-Cost: 9,966 (Total Fundraising * 15%)