completed

Project Managment & Track Directory

$21,500.00 Received
$21,500.00 Requested
Ideascale logo View on ideascale
Community Review Results (1 reviewers)
Addresses Challenge
Feasibility
Auditability
解决方案

用于管理由催化剂资助的项目的平台,对主要的KPIS、审查、指标、新闻、评论、评级和更新进行监测。

Problem:

如何管理信息,以一种有组织的、集中的和透明的方式跟踪由催化剂资助的数千个项目的演变。

Yes Votes:
₳ 41,524,353
No Votes:
₳ 9,714,767
Votes Cast:
107

This proposal was approved and funded by the Cardano Community via Project F8: Improve and Grow Auditability Catalyst funding round.

  • download
  • download
  • download
  • download
  • download
  • download

[影响] 请描述你建议的解决方案。 项目管理和跟踪目录,我们希望成为一个由催化剂开发和资助的项目的平台,以向社区提供关于项目发展的更多透明度和可见性。

我们甚至会通过Catalyst开放式创新项目使Cardano资助的资源的使用情况得到宣传,这将使整个生态系统更加可信。

请描述你提出的解决方案将如何解决你提交的挑战。 我们将提供简单易用的工具,帮助管理要交付的项目,以及性能指标和操作数面板,显示所开发项目的主要KPI。

我们还将创建一份通讯,告知社区有关受资助项目的进展,带来主要数字,以及Cardano的资金资源如何应用于项目。

非常重要的一点是,我们在帮助项目的同时,也向社区反馈该项目是否给Cardano生态系统带来了成果,这是我们需要回答的主要问题。

有哪些主要的风险可能会阻止你们成功地交付项目,请解释你们将如何减轻每个风险? 该项目面临的主要挑战是如何让由催化剂公司开发和资助的项目的创始人和团队更新项目进展的信息和关键绩效指标。

很多信息没有披露,只留下了项目的技术团队,所以我们需要吸引和鼓励他们对社区透明,公开他们的数字和结果。

我们将尝试通过采访和跟踪获得这些信息,但我们取决于是否有机会和清晰地发送这些数字。

[可行性] 请提供交付解决方案的详细计划和时间表。 月1日。

开始平台架构规划 收集需求和功能 创建网站线框 与主要用户进行验证 对线框进行调整和改编 线框定稿

第2-3个月。

网站的用户体验/用户界面研究 创建带有一些屏幕的第一版界面 验证需求和功能 对第一版界面进行调整 与主要用户进行设计和用户体验验证 设计调整 创建所有其他屏幕和界面

第4个月。

验证需求和功能 开始前端编程 与用户一起验证前端编程 开始前端和后端整合 将项目纳入应用数据库 为创始人发布登录和密码以验证面板

第5个月。

完成前端和后端的整合 MVP发布,作为项目早期采用者的测试版本 验证反馈和平台改进

第六个月。

正式推出平台 与媒体伙伴、内容门户网站、加密货币专业网站沟通。 请提供一份详细的预算明细。 如果我们被催化剂公司选中,可以提供更完整的细节。

开发者:2,800美元x4个月=11,200美元

产品负责人:900美元 x 4个月 = 3,600美元

营销助理:600美元 x 4个月 = 2,400美元

用户体验/用户界面设计师:900美元 x 3个月 = 2,700美元

亚马逊AWS服务维护(1年)。$1,600

总计:21,500美元

请提供完成该项目所需的团队成员的详细资料。 Otávio Lima - https://www.linkedin.com/in/otavioaclima/

Cardano Feed的创始人兼CEO

企业家和对技术的热情,我在16岁时就开始工作,当时我成立了我的第一家技术公司,我从未停止。我创办了一些互联网创业公司,有些成功,有些则不太成功。在硅谷/硅谷,加利福尼亚(美国),在里约热内卢和贝伦,我开始了6个月的业务。

我在B2B和B2C电子商务、市场、数字营销、UX/用户体验、导航测试、界面、信息架构、大数据、数据驱动、数据科学、网络指标、BI(商业智能)、开放式创新、众包、ERP整合、数字标牌/数字标牌和户外数字媒体方面有实践和理论知识。

我积极参与加密货币/区块链,DeFi,加密货币,比特币(BTC),Cardano(ADA),ZCore(ZCR),B2U币(B2U)和Binance币(BNB)等数字货币的爱好者和粉丝。

Marcus Vinicius - https://www.linkedin.com/in/mvroque/

卡达诺大使

Marcus Vinicius在2014年认识了比特币,但在2016年开始参与到加密货币市场。马库斯成为Cardano的大使已经有将近3年的时间。自2017年项目启动以来,他是巴西第一批活跃的Cardano社区成员之一。他的背景是在金融(经济)和教育(物理)领域。

https://www.instagram.com/cardanobr/

https://twitter.com/cardanobr

Felipe Barcelos - https://www.linkedin.com/in/felipebarcelospro/

全栈和软件工程师

我从9岁开始学习计算机,一直在寻找解决问题和创造价值的方法。所有这一切将我带入了创业的旅程,并使我在18岁时开启了我的创业公司。

近年来,我一直致力于提高我在清洁代码、重构、TDD、DDD、设计模式、清洁架构和Javascript等语言方面的技术专长。使用的框架包括Next JS、Angular JS、Nest JS、Strapi和其他一些框架。

Gino Matos - https://www.linkedin.com/in/gino-matos-06296b172/

密码记者和内容编辑

我专门从事写作。我有担任主编的经验,开发新闻文章、新闻稿、电子书(我担任鬼才作家)、文章翻译和视频的字幕。

我有数字营销、内容营销和电子邮件营销方面的知识。我最擅长的软技能是同理心、沟通和主动性。

Lucas Fernandes - https://www.linkedin.com/in/lucas-fernandes-silva/

市场营销助理

2021年在圣保罗创办了一家教育创业公司,因为我洞察到我们目前的教学模式与就业市场的需求不一致。从那时起,我的主要目的就变成了创造、分享和连接世界各地的人们的经验和知识,提供新的机会来发展他们今天在未来的职业中所需要的技能。

今天,我最大的动力来自于表明任何梦想都是可能的,对于那些真正有大梦想、脚踏实地、一步一个脚印的人来说,没有任何限制。我们当然只是处于一个伟大旅程的开始"。

[可听性] 请描述你将如何衡量项目的进展和发展? 访问该平台的次数 注册项目的创始用户的数量 项目中评估的数量 对项目的评论数量 本项目的成功是什么样子的? 这个项目的成功可以被定义。

注册项目的数量 项目更新的关键绩效指标的数量 有关项目的新消息的数量 请提供信息,说明本建议是催化剂中以前资助的项目的延续,还是一个全新的项目。 这是个新项目。

社区顾问评论 (1)

Comments

Monthly Reports

We are working on detailed requirements gathering for detailed development scope of the project.

Disbursed to Date
$21,500
Status
Still in progress
Completion Target
11/15/2022
Comments 0

Login or Register to leave a comment!

In a very preliminary way, we have already started to sketch an interface for what the platform will be. In parallel, we are building a database with project information, through material provided by Catalyst itself and linking it with important information for project analysis.

Disbursed to Date
$21,500
Status
Still in progress
Completion Target
11/15/2022
Comments 0

Login or Register to leave a comment!

We are cataloging projects funded by Catalyst and are also thinking about a front-end to validate with users. We will do some design, navigation and user experience tests. We're moving fast!

Disbursed to Date
$21,500
Status
Still in progress
Completion Target
3. In the next 6 months
Attachment(s)
Comments 0

Login or Register to leave a comment!

We are cleaning data and classifying projects for correct display on the front-end of the site. We validated the interface with some key users and received some suggestions for improvements and needs to better monitor the projects.

Disbursed to Date
$21,500
Status
Still in progress
Completion Target
3. In the next 6 months
Attachment(s)
Comments 0

Login or Register to leave a comment!

We have already passed the validation of features and requirements with users and developed the front-end screens and connection to endpoints to assemble the project database and manage/track them.

We created a microservice to connect the spreadsheets used by Cardano Catalyst directly to our database for use and availability to users on a web platform, with various filters, usability and an interface created with the best experience of the product in mind to monitor the progress of financed projects. and give greater visibility to the Cardano community.

We are working on creating a dashboard with the big numbers of all funds financed by Catalyst and a complete breakdown by project, with all metrics related to the project, amounts received, progress made, reports made, screenshots of the evolution of the approved proposal.

Disbursed to Date
$21,500
Status
Still in progress
Completion Target
2. In the next 3 months
Comments 0

Login or Register to leave a comment!

In this cycle we focused our efforts on finalizing the application's FrontEnd proposal, defining the access flows to the proposals in Desktop, Tablet and Mobile. Giving the user the possibility to navigate between funds, filter projects and view a project page. On the project page, it is now possible to see key characteristics of the proposal, such as: team, description, image attachments, links, how many yes and no votes, how many wallets voted, reports delivered and reviews;

What we deliver:

  • Proposal page:
    • Basic information of the proposal:
      • Title;
      • Status;
      • Background;
      • Category;
      • Author;
      • Problem to be solved;
      • Solution;
      • Score of the proposal with the revieres;
    • Project description;
    • Image attachments;
    • Links;
    • Votes (Yes and No);
    • Number of wallets;
    • Project team;
    • Reports;
    • Reviews;
    • Related projects;

Next steps:

  • Finalize the API;
  • Fully integrate with FrontEnd;
  • Focus on testing for the release and making it available to a small group of users;
Disbursed to Date
$21,500
Status
Still in progress
Completion Target
1. In the next month
Comments 0

Login or Register to leave a comment!

Completed Project!

Disbursed to Date
$21,500
Status
Complete
Completion Target
1. In the next month
Comments 0

Login or Register to leave a comment!

close

Playlist

  • EP2: epoch_length

    Authored by: Darlington Kofa

    3分钟24秒
    Darlington Kofa
  • EP1: 'd' parameter

    Authored by: Darlington Kofa

    4分钟3秒
    Darlington Kofa
  • EP3: key_deposit

    Authored by: Darlington Kofa

    3分钟48秒
    Darlington Kofa
  • EP4: epoch_no

    Authored by: Darlington Kofa

    2分钟16秒
    Darlington Kofa
  • EP5: max_block_size

    Authored by: Darlington Kofa

    3分钟14秒
    Darlington Kofa
  • EP6: pool_deposit

    Authored by: Darlington Kofa

    3分钟19秒
    Darlington Kofa
  • EP7: max_tx_size

    Authored by: Darlington Kofa

    4分钟59秒
    Darlington Kofa
0:00
/
~0:00