not approved
CCC: PRISM RIDE @MOA; 40M Visits/yr
Current Project Status
unfunded
Total
amount
Received
$0
Total
amount
Requested
$150,000
Total
Percentage
Received
0.00%
Solution
Problem
Addresses Challenge
Feasibility
Auditability

Nosotros

1 member

  • download
  • download
  • download
  • download
  • download
  • download
  • download

Detailed Plan

MOA = Mall of America

**************************See Attached PDF**************************

The attached PDF addresses planning the “Cardano Accelerator Portal” ride only (the subject of this specific funding proposal).

The Big Picture: (For your reference and to save you time, provide greater context and consistency see and vote for as well: https://cardano.ideascale.com/a/dtd/CCC-Work-Live-Play@MOA/366871-48088 )

Key Performance Indicators:
Concept design complete within 2 months of receipt of funds.

Stage 2 Ready

Reseñas de CAs (1)

Comments

close

Playlist

  • EP2: epoch_length

    Authored by: Darlington Kofa

    3m 24s
    Darlington Kofa
  • EP1: 'd' parameter

    Authored by: Darlington Kofa

    4m 3s
    Darlington Kofa
  • EP3: key_deposit

    Authored by: Darlington Kofa

    3m 48s
    Darlington Kofa
  • EP4: epoch_no

    Authored by: Darlington Kofa

    2m 16s
    Darlington Kofa
  • EP5: max_block_size

    Authored by: Darlington Kofa

    3m 14s
    Darlington Kofa
  • EP6: pool_deposit

    Authored by: Darlington Kofa

    3m 19s
    Darlington Kofa
  • EP7: max_tx_size

    Authored by: Darlington Kofa

    4m 59s
    Darlington Kofa
0:00
/
~0:00