completed
Onboard Manufacturing Industry !
Current Project Status
Complete
Amount
Received
$7,500
Amount
Requested
$7,500
Percentage
Received
100.00%
Solution

En utilisant les compétences de notre équipe dans le domaine de la fabrication, nous procéderons à une analyse approfondie des opportunités et des obstacles spécifiques.

Problem

Jusqu’à récemment, les responsables de l’innovation industrielle considéraient la technologie DLT/Blockchain comme un engouement prématuré. Cette situation est en train de changer rapidement

Addresses Challenge
Feasibility
Auditability

DLT360 Consulting

2 members

  • Project Information
  • Community Reviews
  • Team Information
Onboard Manufacturing Industry !
Start date
-
Milestones
-
Next Milestone
-

Avis des conseillers communautaires (1)

Comments

Monthly Reports

Work in progress, will add progress-file with next report.

Disbursed to Date
$7,500
Status
Still in progress
Completion Target
6/30/2022
Comments 0

Login or Register to leave a comment!

I have delivered all reports so far, why was last month marked as 'missing' (or do I misinterpret this) ?

Disbursed to Date
$7,500
Status
Still in progress
Completion Target
6/30/2022
Attachment(s)
Comments 0

Login or Register to leave a comment!

Work in progress. New status-video will come with next monthly report.

Disbursed to Date
$7,500
Status
Still in progress
Completion Target
6/30/2022
Comments 0

Login or Register to leave a comment!

Project PAUSED for June (see reasoning provided above)

Disbursed to Date
$7,500
Status
Still in progress
Completion Target
9/30/2022
Attachment(s)
Comments 0

Login or Register to leave a comment!

  1. Reviewing of the results of phase 1 before June 2022 (where we did some pre-work in MIRO and in our original SaaS-Tool licensed from ITONICS).

  2. Since beginning of September again: Weekly working-group sessions, touching all our work streams in the segments of business, technology, legal, ESG and politics (under the business-related guidance of Thorsten Pottebaum and Heinz Gassner, under legal guidance of Mary Shenk and Michiel Van Roey, soon under special guidance of a renowned professor of the Brussels School of Governance for ESG and Politics AND in coordination with DLT & Blockchain institute of University of Malta as part of a sponsored Dissertation).

  3. Ongoing: Basic research (in form of a sponsored Dissertation based on extensive literature study and interdisciplinary expert interviews) of how to 'appetise' WEB3.0 and future Metaverse in the area of Digital Transformation of Manufacturing Industry. Establishing a strong collection of academic and industry-related material in ZOTERO, drafting the Dissertation in coordination with University of Malta supervisors. Draft Title of the Dissertation:

'WEB3.0 (DLT, Blockchain and the Metaverse): A logical next step in the digital transformation of manufacturing industry? A contribution to taxonomy with recommendations for corporate risk-management and digital transformation strategy.'

  1. Next steps: Transforming the Dissertation into a DLT360 WHITEPAPER. This will then become integral part of the BUSINESS/ECONOMY section of our DLT360 NAVIGATOR and show up as OPPORTUNITIES and RISKS on the related DLT360 Risk & Opportunity Radar.

  2. We expect closeout in December

Disbursed to Date
$7,500
Status
Still in progress
Completion Target
2. In the next 3 months
Comments 0

Login or Register to leave a comment!

No funding instalment for this specific project requested for this month, as we were mainly working on:

  1. Integrating our various projects (and content) into our overall overall DLT360 NAVIGATOR environment (based on GitHub, OBSIDIAN, ZOTERO and specific applications on our WEB-site)

  2. Refining our overall processes, tools and team-setup for securing longterm success

  3. Focusing on getting the overall DLT360 Whitepaper done and finalise our company foundation (most likely as Hong Kong Limited Company).

Disbursed to Date
$7,500
Status
Still in progress
Completion Target
2. In the next 3 months
Comments 0

Login or Register to leave a comment!

No funding instalment for this specific project requested for this month, as we were mainly working on:

  1. Integrating our various projects (and content) into our overall overall DLT360 NAVIGATOR environment (based on GitHub, OBSIDIAN, ZOTERO and specific applications on our WEB-site)

  2. Refining our overall processes, tools and team-setup for securing longterm success

  3. Focusing on getting the overall DLT360 Whitepaper done and finalise our company foundation (Hong Kong Limited Company).

Disbursed to Date
$7,500
Status
Still in progress
Completion Target
1. In the next month
Comments 0

Login or Register to leave a comment!

Our focus in December:

  1. Weekly working-group sessions under the business-related guidance of Thorsten Pottebaum and Heinz Gassner. The discussions are documented in MIRO and the results are kept in our GitHub repository and in OBSIDIAN as well as on DROPBOX (until we find better solutions).

  2. Establishing the Economy/Business/Industry Segment of the DLT360 NAVIGATOR. We do this basic structuring for Primary, Secondary, Tertiary and Quaternary Industries and by applying industry-best-practice management process frameworks.

  3. Elaborating NAVIGATOR details for the Manufacturing Industry (major parts of the Secondary Industry Segment)

  4. Sync with our planned DLT360 Innovation Accelerator Program, so that the established NAVIGATOR content and Risk & Opportunity Radar Content is best suitable for our future industry cohort-programs.

  5. Checking, correcting and refining of the Economy/Business/Industry Segment of the DLT360 NAVIGATOR.

Open:

  • Some minor optimisation
  • Finalising Closing Report and Closing Video
Disbursed to Date
$7,500
Status
Still in progress
Completion Target
1. In the next month
Comments 0

Login or Register to leave a comment!

close

Playlist

  • EP2: epoch_length

    Authored by: Darlington Kofa

    3 min 24 s
    Darlington Kofa
  • EP1: 'd' parameter

    Authored by: Darlington Kofa

    4 min 3 s
    Darlington Kofa
  • EP3: key_deposit

    Authored by: Darlington Kofa

    3 min 48 s
    Darlington Kofa
  • EP4: epoch_no

    Authored by: Darlington Kofa

    2 min 16 s
    Darlington Kofa
  • EP5: max_block_size

    Authored by: Darlington Kofa

    3 min 14 s
    Darlington Kofa
  • EP6: pool_deposit

    Authored by: Darlington Kofa

    3 min 19 s
    Darlington Kofa
  • EP7: max_tx_size

    Authored by: Darlington Kofa

    4 min 59 s
    Darlington Kofa
0:00
/
~0:00